Skip to main content Book a Site Visit
    High-Performance Facades

    Aluminum Curtain Wall Systems — Chicago Design & Install

    Stick-built and unitized curtain wall for offices, hotels, high-rises, and institutional projects. Full BIM/CAD coordination and union installation from grade to 50 stories.

    We fabricate and install pressure-plate, structural silicone, and unitized curtain wall systems. Every job includes AAMA-tested performance data, thermal simulations, and a Chicago-licensed erector crew.

    AAMA Tested

    Structural, water, and air-infiltration performance data on every system.

    Stick or Unitized

    Stick-built for low- and mid-rise; unitized for high-rise and fast-track schedules.

    Thermal Simulations

    NFRC U-value, SHGC, and condensation resistance provided in submittals.

    High-Rise Certified

    Swing-stage and boom-lift certified crews for glazing above 5 stories.

    Anatomy

    Curtain wall IGU makeup

    Curtain wall performance comes down to the IGU: coating position, gas fill, spacer, and edge seal all determine U-value, condensation resistance, and warranty life. We spec every unit against your energy model and code path before ordering.

    Illustration
    Curtain wall IGU makeup
    Cross-section illustration of an insulated glass unit showing outboard lite, argon-filled cavity, low-e coating, warm-edge spacer with desiccant, and dual PIB and silicone seal.
    Typical 1 inch dual-pane low-e IGU used in stick-built and unitized curtain wall.

    Curtain Wall Systems We Install

    Core systems and configurations we specify, fabricate, and install most often.

    Kawneer 1600 Wall System 1

    Pressure-equalized 2-1/2" x 7-1/2" stick-built system — the Chicago standard.

    Kawneer 1600 UT / UT2

    Unitized panels shop-glazed for high-rise and fast-track towers.

    YKK YCW 750 XT / YCW 750 IG

    Thermal pressure-plate curtain wall with excellent U-values.

    Structural Silicone Glazed

    4-sided SSG for a monolithic, frameless exterior aesthetic.

    Glass, Finish & Hardware Options

    Common upgrades and specifications available for every curtain wall project.

    1" Insulated Low-E Glass

    Dual-pane with argon fill and soft-coat low-e for peak thermal performance.

    Triple-Pane IGUs

    1-3/8" or 1-1/2" triple glazing for Passive House and net-zero projects.

    Laminated Interlayer

    SGP laminated makeup for wind-borne debris and fall-protection.

    Ceramic Frit & Digital Print

    Bird-friendly and shading patterns applied via ceramic frit or digital ceramic ink.

    Typical Applications

    • Class-A office and corporate HQ facades
    • Hotel and hospitality tower exteriors
    • Multi-family residential high-rises
    • University, healthcare, and civic buildings
    • Curtain wall re-glaze and IGU replacement

    Frequently Asked Questions

    What's the difference between stick-built and unitized curtain wall?+

    Stick-built assembles piece-by-piece on the building — economical for low- and mid-rise. Unitized ships as shop-glazed panels that hang from anchors, which is faster and safer for high-rise. We design and install both.

    Can you replace individual IGUs in an existing curtain wall?+

    Yes. We remove the pressure plates, extract failed units, and re-glaze with matching or upgraded IGUs — typically without scaffolding for accessible elevations.

    Do you provide shop drawings and calculations?+

    Every curtain wall project includes stamped shop drawings, structural calculations, and AAMA performance data submitted for architect review before fabrication.

    What lead times should we plan for?+

    Standard stick-built systems ship 8–12 weeks from approved submittals. Unitized systems run 16–24 weeks. Emergency IGU replacements can be expedited to 2–4 weeks.

    Ready to spec your curtain wall project?

    Send us your drawings, dimensions, or photos and we'll return a firm quote with lead time — usually the same business day.