
Fire-Rated Glazing — Listed Assemblies, Zero Shortcuts
We installed a 2-hour UL fire-rated glass wall at Wrigley Field — 600 lb lites, set by hand, passed inspection. We bring that same rigor to every fire-rated job, from stairwell vision lites to full atrium enclosures.
A fire-rated assembly is only as good as its weakest component.
We don't improvise. Every glass, frame, seal, and anchorage detail is matched to the tested and listed assembly.
Full Assembly Compliance
The UL listing covers the whole assembly: glass, frame, glazing compound, anchorage. We don't mix unlisted components. Your assembly is what it says it is.
Rating Range
20-minute vision lites through 3-hour full wall assemblies. We spec Pyran Platinum, SuperLite, Contraflam, and FireLite based on your application requirements.
Inspection Ready
We coordinate with the AHJ (Authority Having Jurisdiction) before we leave the site. Our installs are documented, listed, and pass inspection.
Where fire-rated glazing earns its keep.
From code-required separation to occupant visibility, we match the rating and product to the opening.
Documented, listed, and signed off.
- Licensed, bonded & insured commercial glazing contractor
- UL-listed assembly sourcing with full documentation
- Chicago Department of Buildings permit experience
- AHJ coordination before, during, and after install
- Featured project: 2-hour fire-rated glass wall at Wrigley Field
- In-house fabrication and certified glazier crews

We glazed the Cubs bullpen at Wrigley Field.
A 2-hour fire-rated glass wall, 600+ lbs per lite, one-month build. If we can pass UL inspection at Wrigley, we can pass it at your jobsite.
Real jobsite photos
Fire-rated glazing, spec to sign-off.
UL-listed assemblies, documented every step, inspected and approved.
- 01Review plans1 visit
Identify rating, opening size, frame type, and applicable UL assembly for the application.
- 02Spec assembly2–5 days
Source listed glass, frame, glazing tape, and anchorage from the same UL-approved system.
- 03Permit & submittal3–10 days
Submit cut sheets, UL labels, and engineering to the AHJ and building department.
- 04Install1–5 days
Set the listed assembly exactly per manufacturer instructions; label and document every opening.
- 05AHJ sign-off1 visit
Walk the inspector through the assembly, labels, and fire-stop details. Pass, then warranty.
Fire-rated glazing across Chicagoland.
Chicago, Schaumburg, Oak Brook, Naperville, Rosemont, Evanston, Elmhurst, and the collar counties.
Assembly detail
What a 20-, 60-, and 120-minute assembly actually looks like.
