Skip to main content Book a Site Visit
    Fire-rated glass wall installation at Wrigley Field in Chicago by Chicago Glass Company of IL
    Fire-Rated Glazing — Chicago

    Fire-Rated Glazing — Listed Assemblies, Zero Shortcuts

    We installed a 2-hour UL fire-rated glass wall at Wrigley Field — 600 lb lites, set by hand, passed inspection. We bring that same rigor to every fire-rated job, from stairwell vision lites to full atrium enclosures.

    What Makes It Listed

    A fire-rated assembly is only as good as its weakest component.

    We don't improvise. Every glass, frame, seal, and anchorage detail is matched to the tested and listed assembly.

    Full Assembly Compliance

    The UL listing covers the whole assembly: glass, frame, glazing compound, anchorage. We don't mix unlisted components. Your assembly is what it says it is.

    Rating Range

    20-minute vision lites through 3-hour full wall assemblies. We spec Pyran Platinum, SuperLite, Contraflam, and FireLite based on your application requirements.

    Inspection Ready

    We coordinate with the AHJ (Authority Having Jurisdiction) before we leave the site. Our installs are documented, listed, and pass inspection.

    Common Applications

    Where fire-rated glazing earns its keep.

    From code-required separation to occupant visibility, we match the rating and product to the opening.

    Stairwell enclosures
    Corridor glazing
    Atrium separations
    Tenant separation walls
    School security vestibules
    Loading dock windows
    Healthcare corridors
    Why Chicago Glass Company of IL

    Documented, listed, and signed off.

    • Licensed, bonded & insured commercial glazing contractor
    • UL-listed assembly sourcing with full documentation
    • Chicago Department of Buildings permit experience
    • AHJ coordination before, during, and after install
    • Featured project: 2-hour fire-rated glass wall at Wrigley Field
    • In-house fabrication and certified glazier crews
    Close-up of the UL-listed fire-rated glass wall installed at Wrigley Field by Chicago Glass Company of IL
    Featured Project

    We glazed the Cubs bullpen at Wrigley Field.

    A 2-hour fire-rated glass wall, 600+ lbs per lite, one-month build. If we can pass UL inspection at Wrigley, we can pass it at your jobsite.

    From the field

    Real jobsite photos

    How it works

    Fire-rated glazing, spec to sign-off.

    UL-listed assemblies, documented every step, inspected and approved.

    1. 01Review plans
      1 visit

      Identify rating, opening size, frame type, and applicable UL assembly for the application.

    2. 02Spec assembly
      2–5 days

      Source listed glass, frame, glazing tape, and anchorage from the same UL-approved system.

    3. 03Permit & submittal
      3–10 days

      Submit cut sheets, UL labels, and engineering to the AHJ and building department.

    4. 04Install
      1–5 days

      Set the listed assembly exactly per manufacturer instructions; label and document every opening.

    5. 05AHJ sign-off
      1 visit

      Walk the inspector through the assembly, labels, and fire-stop details. Pass, then warranty.

    Service Area

    Fire-rated glazing across Chicagoland.

    Chicago, Schaumburg, Oak Brook, Naperville, Rosemont, Evanston, Elmhurst, and the collar counties.

    Assembly detail

    What a 20-, 60-, and 120-minute assembly actually looks like.

    FIG — UL 263 / NFPA 252
    Fire-rated glazing assemblies
    Cross-sections of 20-minute ceramic, 60-minute filled multi-lite, and 120-minute wall assembly with intumescent interlayer
    Each assembly is spec'd to the AHJ opening — we submit cut sheets before we fabricate.

    Straight answers