Skip to main content Book a site visit · we confirm who and when
    Fire-rated glazing · quote only

    2-Hour Fire-Rated Glass

    Two hours, quoted as a complete listed assembly: the glass, the frame, the glazing tape and the anchorage together.

    What it is

    A fire rating is a time. A 2-hour (120-minute) rating means the assembly it belongs to was tested and listed for 2 hours. The number applies to that listed assembly as a whole, not to glass installed in any frame.

    We quote it that way. The glass, the frame, the glazing tape and the anchorage are matched to the same listed system. We work from the listing for your assembly.

    Two hours is fire-resistive territory. Fire-protective glazing (20–45 minutes) blocks flames and smoke; fire-resistive glazing (60–120 minutes) also blocks heat, which is why it can be used in larger openings and rated walls. The code and your wall assembly decide. Our fire-rated work runs from 20-minute vision lites up to 3-hour full wall assemblies.

    Where we use it

    • Openings where the project drawings or the label on the existing frame call for a 2-hour rating
    • Rated walls and larger openings where the assembly asks for fire-resistive glazing rather than fire-protective

    From the field

    Two hours belongs to the assembly

    The glass, the frame, the glazing tape and the anchorage have to match the same listed system. A rated lite set in the wrong frame or with the wrong tape does not carry the assembly's rating.

    Fire-resistive, not fire-protective

    A 2-hour opening is normally fire-resistive: it blocks heat as well as flames and smoke. That is what lets it go into rated walls and larger openings. The code and your wall assembly decide which one an opening needs.

    Check the listing limits

    Each listed system has its own limits on glass size, framing and installation. We work from the listing for your assembly, not from a rule of thumb.

    Existing frames need a look

    The glass has to match the listing of the frame it goes into. Send photos and sizes of the frame and we will tell you what else we need to confirm before we quote.

    We have installed 2-hour glass

    CGC installed a 2-hour fire-rated glass wall at Wrigley Field — each lite over 600 lbs. It is in our project gallery. Your opening gets its own listing and its own quote.

    Written estimates

    We quote in writing and keep materials and labor separate. Timing depends on scope and availability and is confirmed in the written quote.

    2-hour fire-rated glass wall at Wrigley Field in Chicago
    CGC's installed 2-hour fire-rated glass wall at Wrigley Field — the same rating this page quotes. Your opening gets its own listing and its own quote.

    Project request

    Request this system for your project

    Send the opening, location, and any drawings you have. We’ll review the system and call you back.

    Written estimate
    Tell us about the job.

    For emergencies, call 708-800-7120. Privacy Policy

    Frequently Asked Questions

    What does 2-hour fire-rated glass mean?+

    It means the glass is part of an assembly that was tested and listed for 2 hours, or 120 minutes. The rating applies to the listed assembly as a whole: glass, frame, glazing tape and anchorage together.

    What is the difference between fire-protective and fire-resistive glass?+

    Fire-protective glazing (20–45 minutes) blocks flames and smoke. Fire-resistive glazing (60–120 minutes) also blocks heat, which is why it can be used in larger openings and rated walls. The code and your wall assembly decide which one an opening needs.

    Can 2-hour glass go into my existing frame?+

    Not automatically. A listing covers a specific combination of glass, frame, glazing tape and anchorage, so we match the glass to the frame it is going into before we quote. Send photos and sizes of the frame.

    Have you installed 2-hour fire-rated glass before?+

    Yes. We installed a 2-hour fire-rated glass wall at Wrigley Field, with each lite over 600 lbs. It is in our project gallery. Your opening gets its own listing and its own quote.

    How is it priced?+

    Quoted in writing, with materials and labor separated. Timing depends on scope and availability and is confirmed in the quote.

    Send us the opening and the project requirements.

    We quote in writing and keep materials and labor separate. Timing depends on scope and availability and is confirmed in the written quote.

    WhatsApp photos