Skip to main content Book a Site Visit
    Frameless glass stair and balcony railing installation at McDonald's headquarters in Chicago by Chicago Glass Company of IL
    Glass Railings — Chicago

    Glass railings, fabricated and installed across Chicagoland.

    Frameless decks, stair runs, high-rise balconies — we design it, bend the aluminum ourselves in Melrose Park, and install it. The railing at McDonald's headquarters is ours; ask us how it stayed dead straight.

    New — CRL TURBOFLEX

    TURBOFLEX: adjust the glass after it's already set.

    TURBOFLEX is CRL's newest dry-glaze base shoe, and it's the one we reach for on long frameless runs. We tilt each panel about 2° in either direction and raise or lower it 1/8" once the glass is already in the shoe — so the top edge runs dead straight even when the concrete under it doesn't. One universal shoe handles 1/2" through 27/32" glass, the multi-hollow extrusion uses roughly 60% less material than the old shoes, and it's impact tested to Miami-Dade HVHZ.

    • ±2° in-place glass tilt
    • 1/8" height adjustment per panel
    • Universal 1/2"–27/32" glass bite
    Systems We Install

    Every railing system we build — pick yours.

    Single deck or a 20-story balcony program — we spec it, fabricate it in our own shop, and install it. No middlemen in between.

    Digitally Printed Decorative Glass

    Ceramic-frit patterns for glass rail panels, with bird-friendly dot and line options.

    Glassfab printing · artwork and pattern spacing confirmed per job

    Curved Glass Railing Systems

    True curved glass guards in tempered or laminated glass, with a hardware layout picked for the curve and the structure.

    Glassfab spigots, standoffs, clamps or base shoe

    CRL TURBOFLEX Dry-Glaze Base Shoe

    CRL's newest base shoe. We tilt the glass ±2° and raise or lower each panel 1/8" after it's set, so every top edge lines up even when the slab doesn't.

    Universal shoe: 1/2"–27/32" glass · Miami-Dade HVHZ impact tested · ~60% less material

    TAPER-LOC Dry-Glaze Base Shoe

    Continuous aluminum shoe with a mechanical taper set — no wet cement, no cure time, and panels can be reset years later without demoing the shoe.

    Fascia or top-mount · 3/4" tempered laminated standard

    Wet-Glaze Base Shoe

    The traditional cement-set shoe. Still the most economical way to get a true frameless run on a long, straight balcony program.

    Cement-set · concealed or clad shoe covers

    Standoff-Mounted Railings

    Stainless standoffs pin the glass to the slab edge or fascia. Nothing under the glass, so the guard reads as a floating pane.

    Satin or mirror stainless · slab-edge or face-mount anchoring

    Post-and-Clamp Railings

    Stainless posts with glass clamps. The workhorse — economical, fast to install, and a single lite can be swapped without touching the run.

    Round or square posts · 1/2" tempered typical

    Frameless Glass Railings

    Unobstructed sight lines with no vertical posts and no top cap — the look most people picture when they say "glass railing."

    3/4" tempered laminated with SGP interlayer

    Semi-Frameless Railings

    Glass panels with minimal stainless or aluminum posts. Cleaner than a full-frame system, more structure and budget room than frameless.

    Top-cap optional · aluminum or stainless uprights

    Interior Stair Railings

    Stair and mezzanine guards for lobbies, offices, and luxury residences — raked panels cut to the stringer angle in our own shop.

    Raked panels · continuous or per-tread shoe

    Commercial Balcony & High-Rise Guards

    Multi-family and hotel balcony programs. Engineered, sealed, and signed off elevation by elevation with swing-stage or lift access.

    200 lb concentrated · 50 plf uniform · wind-load engineered

    Juliet Balcony Railings

    Frameless glass Juliets for full-height French doors and windows — a guard where there's no deck to stand on.

    Face-mount standoffs or mini base shoe

    Pool & Spa Enclosure Guards

    Barrier-code pool fencing in glass, with spigot or shoe mounting and hardware finishes that hold up to chlorine and salt.

    316 stainless hardware · self-closing gate options

    Curved & Radius Railings

    Bent tempered panels for spiral stairs and radiused balconies. We template the curve, bend the glass, and hand-polish the edges in-house.

    Custom radius · hand-polished pencil edge

    Not sure how tall it has to be? Railing heights & code — guard rail vs. hand rail

    Why Chicago Glass Company of IL

    Code-compliant, sight-line-clean, signed off.

    • Licensed, bonded & insured glazing contractor
    • In-house fabrication — precise sizing, faster turnaround
    • All glass meets ASTM C1048 safety glazing standards
    • Installed by certified glaziers — no subcontractors
    • Track record on commercial, high-rise, and residential projects
    • Featured project: McDonald's HQ glass stair & balcony railings
    Overhead view of frameless glass guardrail wrapping the mezzanine and stair opening at McDonald's headquarters, installed by Chicago Glass Company of IL
    Featured Install

    Downtown rooftop terrace — frameless guardrail.

    Engineered for wind load and sealed into a concealed base shoe — finished so the only thing you notice is the skyline.

    Frameless tempered glass guardrail wrapping a downtown Chicago rooftop terrace with skyline views
    Close-up of polished pencil edge on a curved tempered glass railing panel installed by Chicago Glass Company of IL
    Detail Shot

    Edge work you can run your hand across.

    Hand-polished pencil edges on a custom-curved tempered panel. We template the curve, bend the glass, and grind and polish it ourselves — no rough edges, no chip-outs, no surprises at sign-off.

    From the field

    Real jobsite photos

    How it works

    Glass railings, drawing to install.

    Base-shoe, standoff, or pin-fixed — code-compliant and inspection-ready.

    1. 01Site visit
      1 visit

      Measure the run, confirm substrate (concrete, steel, wood), review load path, and pick the system.

    2. 02Shop drawings
      3–7 days

      Stamped drawings for permit and building review; we handle the submittal cycle.

    3. 03Fabricate
      2–4 wks

      Base shoe or standoff hardware, tempered + laminated glass, polished edges — built in our shop.

    4. 04Install
      1–3 days

      Anchor the shoe or standoffs, plumb the glass, gasket, dry-glaze or wet-glaze per spec.

    5. 05Inspection
      1 visit

      We meet the inspector on site with load calcs, tempering stamps, and warranty paperwork in hand.

    Service Area

    Installing railings across Chicagoland.

    Chicago, Oak Park, Evanston, Naperville, Downers Grove, Schaumburg, Oak Brook, Elmhurst, and the rest of the suburbs. We show up when we say we will.

    Straight answers