Skip to main content Book a Site Visit
    Frameless tempered glass guardrail wrapping a downtown Chicago rooftop terrace, installed by Chicago Glass Company of IL
    High-Rise Glazing

    High-rise glass replacement, done by a crew that's been up there before.

    Cracked curtain wall units. Failed seals 30 stories up. Balcony glass that needs a permit and a swing stage. Twenty stories up, in real Chicago wind, on an occupied Class-A tower — for our crews that's a normal Tuesday.

    Live Jobsite — 808 N. Green St, Chicago

    Swing-stage glass replacement with a glass manipulator.

    Real footage, not a stock reel. High-rise curtain wall repair in River North — we rigged the swing stage, hoisted the new IGU with a manipulator, and swapped the unit with the building engineer standing right there.

    808 N. Green St, Chicago, IL — Curtain wall IGU replacement at height

    Live Jobsite — Floor 28, Chicago

    300 lb unit. Exterior set. 28 floors up in the Windy City.

    This is the kind of job most crews won't touch — a heavy glazed unit rigged from the outside of the building, swung past the facade, and seated into a curtain wall frame while the wind is working against you. Our crew treated it like Tuesday.

    Chicago, IL — Exterior curtain wall unit replacement at height, 300 lb IGU

    Case Study

    High-rise window replacement — 808 N. Green St, River North

    A failed IGU on an occupied Class-A office tower needed to come out and go back in without shutting the building down. Here's exactly how we scoped, staged, and got it done — no drama, no downtime.

    Building
    Class-A office tower
    Location
    808 N. Green St, Chicago
    Floor
    Curtain wall — mid-rise elevation
    Scope
    IGU replacement, 1-1/16" insulated Low-E
    Access
    Swing stage + glass manipulator
    Crew
    4 glaziers + building engineer

    The challenge

    • Fogged and failed insulated unit visible from the street — property management wanted it out before the next tour.
    • Occupied tenant floor directly behind the opening. No interior scaffolding allowed during business hours.
    • Curtain wall unit had to match existing spandrel color, Low-E coating, and reflectivity so the facade read seamless.
    • Wind loading on the north face required a rigged manipulator, not a hand set.

    How we solved it

    • Site walk with building engineer; pulled a template of the frame and matched original glass spec at our 10,000 sq ft fab shop.
    • Rigged a two-point swing stage off the roof davits; staged the manipulator on the stage.
    • Removed the failed IGU from the exterior — zero interior disturbance to the tenant.
    • Set the new unit with the manipulator, re-glazed, wet-sealed, and cleaned the facade before descent.
    0
    Tenant hours lost
    1 day
    On-site install
    100%
    Facade color match
    0
    Safety incidents
    "They pulled a 300-pound unit off the outside of a 28-story building and set the replacement in like it was routine. Our tenants never knew we had a crew on the facade."
    — Property manager, downtown Chicago high-rise
    Why Building Owners Trust Us

    Vendor qualifications that keep your property protected.

    We carry the coverage, certifications, and supply relationships property managers and asset managers ask for before we ever set foot on the facade — no chasing paperwork after the fact.

    Insurance & Bonding

    • Commercial general liability & workers' compensation — no subcontractor gap
    • Licensed & bonded commercial glazing contractor in Illinois
    • 20+ years executing high-rise glazing across Chicago's skyline

    Safety & Access

    • OSHA 30-certified lead on every elevated work site
    • Swing stage, boom lift & rope access — fully compliant rigging
    • Fall protection, debris netting & sidewalk barriers on every job

    Supply & Fabrication

    • Direct relationships with major glass and hardware suppliers
    • Custom IGU fabrication in our 10,000 sq ft manufacturing warehouse
    • Coatings, tints & spandrel matched to original facade spec
    Recent Install — Downtown Rooftop

    Frameless rooftop guardrail, walk-around.

    What We Handle at Height

    From a single cracked lite to a full facade program.

    Office towers, condo buildings, hotels, hospitals, and mixed-use high-rises across Chicagoland — occupied or not.

    Curtain Wall IGU Replacement

    Failed seals, cracked lites, or impact damage in unitized and stick-built curtain walls. We coordinate with building engineers, scaffold and swing-stage crews, and tenants so the swap barely registers.

    Spandrel & Vision Glass Swaps

    Matching opacified spandrel panels and vision glass to the existing facade. Color, reflectivity, Low-E coating — spec'd to blend in, not stand out as the obvious new one.

    Storefront & Lobby Glass at Grade

    Ground-floor lobby glass, revolving door wings, and entry vestibules for office towers, hotels, and mixed-use buildings — the glass everyone actually touches.

    Balcony Railing Glass Replacement

    Tempered and laminated balcony glass for high-rise condo and apartment buildings — IBC code-compliant and ready to pull a permit, no back-and-forth with the reviewer.

    Emergency Board-Up at Height

    Somebody breaks a curtain wall lite at 2 a.m. thirty stories up — we've seen it. We secure the opening fast, then come back with the permanent unit.

    Tenant & Common-Area Glass

    Office partitions, conference room glass walls, and corridor sidelites in occupied high-rise tenant spaces, scheduled around business hours so nobody has to work around us.

    Why Property Managers & GCs Call Us

    Permits pulled. Engineers signed off. Tenants barely notice.

    • Licensed, bonded & insured commercial glazing contractor
    • Swing stage, boom lift, and rope access experience
    • OSHA-compliant fall protection on every elevated job
    • Coordination with building engineers, property managers, and GCs
    • After-hours and weekend installs to keep tenants working
    • Custom-fabricated units matched to original facade spec
    From the field

    Real jobsite photos

    How it works

    High-rise glass, done without shutting the tower down.

    Swing stage, boom lift, or interior swap — coordinated with building engineering.

    1. 01Site survey
      1–2 days

      Meet building engineering, review anchor points, tie-off plan, elevator/loading dock windows, and after-hours access.

    2. 02Permits & COI
      3–7 days

      Pull city permits, submit certificates of insurance naming owner + management, coordinate street closures.

    3. 03Fabricate lite
      1–3 wks

      Custom tempered or laminated jumbo lite built to spec in our shop; edges finished for suction handling.

    4. 04Rig & install
      1–3 days

      Swing stage or boom lift, certified riggers, tenant notice handled by us, minimal downtime.

    5. 05Clean + close-out
      Same day

      Final clean, photo documentation, warranty paperwork sent to owner and PM.

    FAQ

    High-rise glass replacement — what to expect

    Timelines, safety, delivery, and permitting — answered by the crew that's done it.

    Service Area

    Up and down the Chicago skyline.

    The Loop, River North, Streeterville, West Loop, Gold Coast, South Loop — and tower buildings throughout the suburbs. Written estimate, plain numbers, no pressure.