Skip to main content Book a site visit · we confirm who and when

    Shower door builder

    Build your shower glass in 3D

    Pick a layout, set the sizes and hardware, turn it around and open it. Every shower is quoted after a field measure.

    Shower: Door and fixed panel, 60 in. wide × 72 in. tall, door 26 in., hinged on the left, Clear 3/8 in. tempered, Polished chrome hardware, Round tubular pull, 8 in., panels in clamps, 2 hinges glass-to-glass. Field measure required.

    1

    Layout

    2

    Size

    Hinge side (seen from outside)

    3

    Glass

    Thickness

    4

    Hardware

    Handle

    Fixed panels held by

    5

    Your build

    Layout
    Door and fixed panel
    Size
    60 × 72 in.
    Door
    26 in. wide · about 64 lb of glass
    Glass
    Clear · 3/8 in. tempered
    Finish
    Polished chrome
    Handle
    Round tubular pull, 8 in. · 8 in. mounting centers
    Hinges
    2 · glass-to-glass
    Price
    Quote required

    Two hinges, within the published Geneva GEN180 limit of 80 lb and 28 in. wide.

    Request a quote for this shower

    We field-measure every shower and review the hardware before fabrication. Wall, curb and floor conditions can change the final sizes. This is a concept view, not a shop drawing.

    Hardware references
    • CRL Geneva GEN180 hinges — 3/8–1/2 in. glass; two hinges to 80 lb and 28 in., three to 120 lb and 32 in.
    • CRL BM series tubular pulls — 6 and 8 in. sizes are mounting centers.
    • CRL Serenity sliding system — One slider and one fixed panel, 5/16 or 3/8 in. glass. Header length is not the door width.
    • CRL Cambridge bypass system — Two moving doors.

    Dimension and style references only. Layouts without a named system are conceptual styles, not a product match.

    Building a storefront or entrance instead? Open the storefront builder.

    Before you request a quote

    How to measure your shower opening

    You'll need a tape measure and a 4 ft level. Measure in inches. Your numbers get us close — we still come out and field-measure before we cut any glass.

    1. TopMiddleBottom

      1. Measure the width three times

      Tape wall to wall at the top, middle and bottom of the opening. Write down all three. Walls are rarely straight, so we need every number, not just one.

    2. LeftRight

      2. Measure the height on both sides

      From the top of the curb (or the tile floor if there's no curb) straight up to where you want the glass to stop. Do the left and right walls.

    3. Bubble centered = plumb

      3. Check the walls for plumb

      Hold a 4 ft level straight up against each wall where the glass will mount. Watch the end bubble. If it's off center, the wall leans — note which way and roughly how much.

    4. Bubble centered = level

      4. Check the curb for level

      Lay the level flat on the curb. Bubble in the middle means it's level. If not, lift the low end until it centers and measure the gap — that tells us how far out it is.

    Corner and neo-angle showers: also measure the return side the same way. Not sure? Call 708-800-7120 and we'll walk you through it.

    WhatsApp photos