Skip to main content
    Curtain Wall & High-Rise Specialists

    High-Rise Glass Replacement in Madison, WI

    From State Street to Capitol Square and Isthmus, we replace high-rise glass in Madison. Failed insulating units, spontaneous nickel-sulfide tempered breakage, impact damage on the 30th floor, curtain wall infill — work most local glaziers can't take on. We mobilize swing stage, coordinate with BMU operators and building engineers, and handle the matched-finish IGU fabrication, hoist, and installation as one accountable scope.

    We've been a commercial glazing contractor since 2016, and we bend our own aluminum in Melrose Park — so "custom" doesn't have to mean "see you in six weeks." You get a written estimate in plain numbers, and the crew that priced the job is the crew that shows up.

    Licensed & insured Locally owned Serving Madison

    High-Rise Glass services in Madison

    Curtain wall failure, blown insulating unit, façade damage — we replace glass on the upper floors of Madison office, residential, and hotel towers using swing stage, BMU, or interior pick crews.

    Swing stage curtain wall re-glaze

    OSHA-compliant swing stage with full rigging plan for façade-side glass replacement on towers 10+ stories.

    Matched-finish IGU fabrication

    Insulating units fabricated to match the existing tower glass — substrate, low-E coating, tint, spandrel — so the new lite disappears into the façade.

    BMU & interior pick coordination

    Where swing isn't possible, we coordinate with the building's BMU or design an interior pick using suction lifters and rolling glass carts.

    Spontaneous breakage response

    Tempered units fail without warning. We respond, secure the opening (plywood, polycarbonate, or temporary IGU), and schedule the matched permanent replacement.

    Our rigging crew setting glass at height on a Chicago high-rise.
    Commercial accordion storefront system project in Madison
    Large-format commercial entry doors and transom glazing project in Madison

    Why Madison buyers call us

    Swing stage

    Trained, OSHA-compliant rigging crews — not a sub-rented to the lowest bidder.

    Matched IGU

    We replicate the original façade glass — coating, tint, spandrel — so the new lite reads identical from grade.

    Engineer-coordinated

    Tight communication with building engineering, property management, and the BMU operator on every floor.

    High-Rise Glass FAQ — Madison

    What floors can you replace glass on in Madison?

    We've worked on towers from 5 stories to 60+. The right access method (swing stage, BMU, interior pick, or scissor lift from a setback) depends on the building's rigging tie-offs, parapet condition, and adjacent traffic.

    How do you match the existing tower glass?

    Match the substrate (annealed, heat-strengthened, tempered, laminated), the low-E coating (Solarban 60/70/90, Solarcool, custom), the tint, the spandrel color, and the spacer. We pull a sample if needed and submit a mockup before fabrication.

    How long from call to installed glass on a high-rise replacement?

    Custom matched-finish IGUs typically run 3–6 weeks from approved order. We secure the opening immediately with plywood, polycarbonate, or a temporary glazed-in panel so the floor is weather-tight while the permanent unit is fabricated.

    Do you handle the rigging permits and building coordination?

    Yes. We submit the rigging plan, pull required permits, coordinate sidewalk protection, and work with building engineering on tie-offs and after-hours access in Madison.

    When the broken glass is on the 30th floor.

    Real glaziers, not a call center. Insurance-ready paperwork, and a written estimate in plain numbers — no pressure.

    WhatsApp photos