Skip to main content Book a Site Visit
    Condo and high-rise glass · quote only

    Condo Building Glass Replacement Programs

    One survey, one written estimate and a phased plan for the fogged and failed insulated glass in your building. For condo associations and property managers in Chicagoland.

    What it is

    A building program replaces fogged and failed insulated glass across a condo or high-rise building as one planned job. We survey the failed glass units, group them by type, price each type and replace them in phases. The alternative is one owner calling at a time.

    The work itself is not new to us. We already replace insulated glass units in high-rises one at a time. Fog between the panes means the seal has failed, so the glass unit is replaced and the existing frame usually stays.

    The program is written for condo associations and property managers. Who is responsible for the window glass depends on the association's declaration, and the board should confirm it. Who is billed is confirmed in the written estimate.

    Scope

    What the program covers
    Survey
    Fogged and failed insulated glass units listed by location and type
    Glass in scope
    Insulated glass units in windows, window walls and curtain wall. Balcony sliding door glass is reviewed with the survey.
    Replacement glass
    Insulated glass units fabricated in our Melrose Park shop to the size of each opening
    Glass match
    Thickness, spacer, low-E coating and tint reviewed against the existing glass
    Pricing
    One price per type of glass unit, in a written estimate
    Access
    Interior access, swing stage, boom lift or rope access, reviewed per building
    Phasing and coordination
    Phases set by floor or wing. Access to residences, resident notice and insurance certificate requirements reviewed with management.

    Where it fits

    • Condo towers with fogged insulated glass on several floors
    • Mid-rise and high-rise residential buildings run by a property management company
    • Window walls and curtain wall with failed insulated glass units
    • Balcony sliding doors with fogged or broken glass

    From the field

    Fog means a failed seal

    Fog or moisture between the panes means the seal on the insulated glass unit has failed. It cannot be cleaned out. The glass unit is replaced and the frame usually stays.

    Who pays depends on the declaration

    Whether the association or the individual owner is responsible for the window glass depends on the association's declaration. We do not make that call. The board should confirm it before the work is approved.

    Access sets the plan

    Some glass comes out from inside the residence. Other glass has to come out from the exterior, from a swing stage, a boom lift or rope access. We review access for each building before we quote.

    Old glass next to new

    New glass next to old glass shows when the tint or coating is off. We review the existing glass before we order. On older buildings an exact match may be discontinued. Where it is, the closest match is approved from samples before anything is installed.

    Written estimates

    We quote in writing and keep materials and labor separate. Lead time is confirmed in the written estimate.

    Project request

    Request a written estimate for your project

    Send the building address, photos and any drawings or reports you have. We review the scope and call you back.

    Tell us about the job

    For emergencies, call (708) 800-7120. Privacy Policy

    Frequently Asked Questions

    Can you replace fogged glass across a whole condo building?+

    Yes. We already replace insulated glass units in high-rises one at a time. For a building program we survey the failed glass units, price each type and replace them in phases. Balcony sliding door glass can be included.

    Who pays for window glass in a condo, the association or the unit owner?+

    It depends on your association's declaration, and buildings handle it differently. We do not decide it. The board should confirm responsibility before the work is approved.

    Do we have to replace the whole window?+

    Usually not. If the frame is sound, the failed glass unit comes out and a new one goes into the same frame. Frame condition is reviewed during the survey.

    What should the board or property manager send?+

    Send the building address, the number of affected windows if you know it, photos, and any window or facade report the building already has. Call (708) 800-7120 or request a written estimate, and we schedule the survey from there.

    Send us the building and the project requirements.

    We quote in writing and keep materials and labor separate. Lead time is confirmed in the written estimate.