    Program guide · high-rise exterior walls

    Chicago Exterior Wall Program: What It Means for Your Building's Glass

    Chicago's Exterior Wall Program is the Department of Buildings' required reporting on the exterior walls of high-rise buildings. This guide is for owners, condo boards, property managers and architects who need to know where glass repair fits.

    Checked against the sources below on November 26, 2026.

    At a glance

    Who runs it
    City of Chicago Department of Buildings, through its Exterior Wall Program.
    Who it applies to
    Owners of high-rise buildings in Chicago, as the code section reads. Confirm coverage for your building with your architect or structural engineer or the Department of Buildings.
    What it asks for
    Written condition reports on the building's exterior envelope. The City requires an original architect or structural engineer stamp or seal on each filed report.
    Filing dates
    The City's page says short forms are due by November 1st and critical exams by December 1st. Ask your architect or structural engineer which year applies to your building.
    Current status
    As of November 2026, the program is in effect: the City's page posts report forms for 2024, 2025 and 2026 and links to Municipal Code Section 14A-6-603.2.
    Who to confirm with
    Your architect or structural engineer, and the Department of Buildings Exterior Wall Program. Contact details are on the City's page.

    Not sure which programs or rules fit your building?

    Use the program check

    What the program is

    The Exterior Wall Program is run by the City of Chicago Department of Buildings. The City's page for it is titled Required Reporting for Exterior Walls of High Rise Buildings. The Exterior Wall Ordinance link on that page goes to Municipal Code Section 14A-6-603.2, Exterior walls of high-rise buildings.

    As of November 2026, that section says the owner of a high-rise building must obtain and submit written condition assessment reports on the building's exterior envelope. The City's page also requires each filed report to carry an original architect or structural engineer stamp or seal.

    The section authorizes the City's building official to require an examination and an inspection, summarized below. This is a summary, so read the section itself at the link under Sources.

    • Critical examination. A periodic, close-up visual examination of the entire exterior envelope, done by or under a registered design professional, who prepares a signed and sealed report.
    • Ongoing inspection. A periodic inspection of the entire exterior envelope to identify deficiencies and determine if repair is required. The registered design professional prepares a signed and sealed report, with repair recommendations where deficiencies are found, and gives it to the owner.

    Who it applies to

    The code section puts the duty on the owner of a high-rise building.

    An engineering firm's guide, listed under Sources, describes the program as applying to exterior walls 80 feet or more in height above grade. That is the firm's wording. The code section itself uses the term high-rise building, and this page does not confirm how that term is measured for a given building.

    We do not decide whether a building is covered. If your building is near that height, or you are not sure a report is due, confirm with your architect or structural engineer or with the Department of Buildings.

    What it means for glass

    The code section's list of exterior envelope parts names windows and doors alongside exterior walls, and a critical examination covers the entire exterior envelope. What a report says about the glass on your building depends on that examination.

    The section says the ongoing inspection report gives repair recommendations where deficiencies are found, and that repairs recommended as a result of a periodic inspection must be completed by the owner in a timely manner. Where a report or repair scope lists sealant, gasket or glass items, send it to us. We review the glazing items and price them in writing.

    Check the permit question before work starts. As of November 2026, the City's permit guide says no building permit is needed in any building to repair damage to an existing window or exterior door, or to replace glass in an existing window sash or door frame. That page does not mention curtain wall or window wall, and its exemptions for replacing a whole window in kind are written for ground-level windows and for residential buildings up to 4 stories above grade. The points below are also as of November 2026.

    • The City's permit guide says these exceptions may not apply to work on a property that is a proposed or designated Chicago Landmark or part of a proposed or designated landmark district.
    • Work the City allows without a building permit must still meet the Chicago Construction Codes.
    • Using a public street, alley, sidewalk or parkway for construction activity or scaffolding needs a separate permit from the Chicago Department of Transportation.
    • A corrective order from the City under the exterior wall section does not waive any permit the repair work needs.
    • Whether your glazing repair needs a building permit is a question for your architect or structural engineer or the Department of Buildings. We do not make that call.

    How filing works

    The City's program page gives two dates: short forms are due by November 1st and critical exams are due by December 1st. The short form is the City's Form EW-1, the report for the ongoing inspection and repair program. The City posts a form for each year, and as of November 2026 the page lists forms for 2024, 2025 and 2026. Ask your architect or structural engineer which report is due for your building and in which year.

    The code section says the building official may reject a report that does not meet the applicable requirements and require the owner to file a new one. The Department also has program rules, and the City's page points to the Department of Buildings homepage for them.

    A City alert says the new provisions of the Phase 3 Construction Codes Modernization Ordinance are mandatory for permit applications started on or after December 1, 2026, and that Phase 3 includes amendments to the Administrative Provisions. The exterior wall section sits in that title of the code. The alert does not mention the Exterior Wall Program, and we could not confirm whether the section changed. Ask your architect or structural engineer which code text applies to your report and your repair permit.

    The City's program page asks for the following:

    • Two copies of the form (short or critical), each with an original architect or structural engineer stamp or seal.
    • The report filing fee, paid at a City of Chicago Department of Finance payment center before the reports are submitted. You print and complete the City's Point of Service Invoice and present it to the cashier. Confirm the current fee with the City.
    • A copy of the validated invoice and receipt, submitted with the two original copies of the report.
    • Reports and proof of payment mailed or delivered to the Department of Buildings, Exterior Wall Program, 2045 W. Washington Blvd., Chicago, IL 60612.

    What we do

    We are a glazing contractor. We are not the licensed architect or structural engineer who performs an exterior wall examination, and we do not stamp or file reports with the City.

    If an engineer has inspected your building or written a repair scope, we review the glazing items and price them in writing. Our estimates are written, with materials and labor separate, and lead time is confirmed in the written estimate.

    We do not decide what a report requires, and we do not promise that a repair will close out a report item. Confirm that with your architect or structural engineer.

    • Leak diagnosis and repair on existing aluminum curtain wall, window wall and storefront.
    • Hardened gaskets replaced, failed wet seals cut out and resealed, and weep paths restored.
    • Failed or cracked glass units replaced and matched to the existing glass.
    • Insulated glass units replaced in high-rises.
    • Access by interior, lift or swing stage, reviewed per building and coordinated with building management.
    • Field work and installation in Chicagoland.

    Project request

    Request a written estimate

    What to send for a written estimate

    • The building address.
    • The exterior wall report or the engineer's repair scope, if you have one.
    • Photos of the glass, gaskets and sealant joints in question.
    • If there is a leak, where the water shows and when.
    • The number of glass units or openings involved, if you know it.
    • The building management contact, so access can be reviewed.
    • Send these with your request for a written estimate, or call (708) 800-7120.
    Tell us about the job

    For emergencies, call (708) 800-7120. Privacy Policy

    Straight answers

    Can you do the exterior wall examination or file the report for us?

    No. We are a glazing contractor. We are not the licensed architect or structural engineer who performs the examination, and we do not stamp or file the report. The City requires each filed report to carry an original architect or structural engineer stamp or seal. If an engineer has inspected your building or written a repair scope, we review the glazing items and price them in writing.

    How often does a building need an examination?

    This page cannot give you your building's schedule. The code section authorizes the building official to require the examinations. One engineering firm's summary of the program, listed under Sources, sorts buildings into categories by the kind of metal the exterior wall is reinforced with or in contact with, and gives a critical examination every 12, 8 or 4 years depending on the category. Those figures come from the firm's summary and were not checked against the Department's rules. The section also lets the building official require a critical examination when the integrity of a building envelope is in doubt. Ask your architect or structural engineer for your building's category and the year your report is due.

    Does replacing glass on a high-rise need a building permit?

    It depends on the work, and we do not decide it. As of November 2026, the City's permit guide lists replacing glass in an existing window sash or door frame as work that needs no building permit in any building. That page does not mention curtain wall or window wall, and it says its exceptions may not apply to a proposed or designated Chicago Landmark or a property in a landmark district. Confirm the permit path for your repair scope with your architect or structural engineer or the Department of Buildings before work starts.

    What happens if the examination finds an unsafe condition?

    The code section says that when a registered design professional finds the exterior envelope needs repair, reinforcement or removal to prevent imminent harm, the professional must notify the building official in writing within 24 hours. The section also authorizes the building official to order the owner in writing to take temporary measures right away to protect the public and to begin permanent repairs within a set time. An order does not waive any permit the work needs.

    Sources

    These are the sources this page was checked against. The agency or ordinance text governs.

    This page is a plain-language summary and not legal advice. The Municipal Code of Chicago and the Department of Buildings' current rules and notices govern, so confirm what applies to your building with your architect or structural engineer and the Department of Buildings.