Wet Sealing, Gasket Replacement and Window Leak Repair
Leak diagnosis and repair on existing aluminum curtain wall, window wall and storefront: wet seals, gaskets, weeps and failed glass units. Field work is in Chicagoland.
What it is
Most leaks in aluminum curtain wall, window wall and storefront are not the glass. They come from gaskets that have gone hard and shrunk, sealant joints that have cracked or let go, and weep holes that are blocked.
We diagnose before we repair. We inspect the joints, gaskets, weeps and sealant, and run controlled water testing where the source is unclear. You get photos of what we found and a written scope.
The repair follows the cause. Hardened gaskets are replaced, failed wet seals are cut out and redone, and weep paths are restored. Where a glass unit has failed, it is replaced. Framing that is sound stays in place.
Scope
- Systems
- Existing aluminum curtain wall, window wall and storefront framing
- Diagnosis
- Visual survey of joints, gaskets, weeps and sealant. Controlled water testing where the source is unclear. Photos of the condition.
- Gaskets and wet seals
- Hardened gaskets replaced. Failed wet seals cut out and resealed. Perimeter joints checked.
- Weeps
- Weep holes and weep paths checked and restored
- Pressure plates and caps
- Reviewed, and replaced where needed
- Glass
- Fogged or failed insulated units and cracked lites replaced, matched to the existing glass
- Access
- Interior, lift or swing stage, reviewed per building and coordinated with building management
Where it fits
- Office buildings with water at a sill, a ceiling or a tenant floor after rain
- Condo and apartment buildings with leaking window wall or curtain wall
- Storefronts and lobby glazing that leak at the sill or the frame joints
- Buildings with an inspection report that lists sealant, gasket or glass items
From the field
Water travels
The stain is rarely under the failure. Water gets in at a joint and runs along the framing before it shows. Tell us where it shows and when: every rain, or only with wind from one direction.
Keep the weeps open
Most aluminum framing is built to drain. Water that gets past the outer seal is collected and let out through weep holes. Sealant over a weep traps that water in the frame, so we check the weeps before we seal a joint.
Fog is not a leak
Fog between the panes means the seal of that insulated unit has failed, and the unit is replaced. It does not explain water on the floor. The frame joints still get checked.
Send the report
Exterior wall inspection reports often list sealant and gasket items. If an engineer has inspected the building or written a repair scope, send it with your request. We review the glazing items and price them in writing.
Written estimates
We quote in writing and keep materials and labor separate. Lead time is confirmed in the written estimate.
Project request
Request a written estimate for your project
Send the building address, photos and any drawings or reports you have. We review the scope and call you back.
Frequently Asked Questions
Water comes in after rain but the glass is not broken. What is wrong?+
Usually it is the gaskets, failed wet seals at the frame joints or a blocked weep path, not the glass. We survey the wall first to find where the water gets in, before anyone prices new glass.
Do you replace window gaskets and wet seal existing curtain wall?+
Yes. Hardened gaskets are replaced, and failed wet seals are cut out and resealed. Which repair a joint needs depends on the system and its condition, so we review the wall before we quote. A glass unit that has failed is replaced and matched to the existing glass.
How do you reach a leak on an occupied building?+
It depends on the building. Where the system allows it, we work from inside. Where it does not, access is by lift or swing stage, coordinated with building management and scheduled around tenants. Access is reviewed per building and stated in the written estimate. Our field work is in Chicagoland.
We have an inspection report that lists sealant and gasket items. Can you price it?+
Send the report with your request, along with photos and the building address. We review the glazing items on it and send a written estimate for the items in our scope. If an engineer has written a repair scope, send that too and we review it before we quote.
Send us the building and the project requirements.
We quote in writing and keep materials and labor separate. Lead time is confirmed in the written estimate.